The YouTube video warning you that AI is draining the planet used more electricity than about 78 million AI images.
That’s not a typo, and it’s not a gotcha invented by a tech bro. It’s arithmetic. Business Insider’s 31-minute documentary Exposing the Dark Side of America’s AI Data Center Explosion has racked up about 8.2 million views. Assume the average viewer sticks around for 70% of it, and you get almost 3 million hours of streaming. Multiply that by the International Energy Agency’s estimate of about 0.077 kilowatt-hours per hour of streamed video, and you land at roughly 228,000 kWh.1 Divide that by the average energy cost of generating an AI image, about 2.9 watt-hours according to the most-cited study on the subject, and you get 78.7 million images.2
One video. Watched by people who were mad about the fuzzy-doll version of somebody’s profile picture.
Now, I’m going to do something the outrage videos rarely do, which is check my own math against the people who’d disagree with me. Because if the case against AI hate is “you didn’t do your homework,” we’d better do ours.
Let’s Do the Math, Honestly
That 78-million-image number is real, but it isn’t a fair fight, and you should know why before you screenshot it.
The IEA’s 0.077 kWh per hour covers everything involved in streaming: the data center, the network carrying the video, and the TV or laptop you’re watching it on. When the IEA’s analyst broke it down, about 72% of that energy was your device, 23% was the network, and only about 5% was the data center.1 The 2.9 watt-hours per AI image, on the other hand, is just the server doing the work. It doesn’t count your phone screen.
So let’s compare data center to data center. Take only the 5% slice of that documentary’s streaming footprint, about 11,400 kWh, and it still works out to roughly 3.9 million AI images. The Carbon Trust’s 2021 study puts the data center share of streaming even lower, around 1 watt-hour per hour of video, which would shrink the number further.3
Here’s what survives the fact-check:
- One hour of streaming, counting everything, uses about 77 watt-hours. That’s roughly 26 average AI images, or about 320 Gemini text prompts at Google’s own published median of 0.24 watt-hours each.4
- A single AI text prompt is tiny. Google reports its median Gemini prompt uses 0.24 watt-hours and 0.26 milliliters of water, which Google describes as about five drops.4 Independent researchers at Epoch AI estimated a typical ChatGPT query at roughly 0.3 watt-hours.5 OpenAI’s Sam Altman put it at 0.34 watt-hours and about one fifteenth of a teaspoon of water, though he didn’t publish a method.6
- Images cost more than text, and models vary wildly. That 2.9 watt-hour figure is an average. The least efficient image model in the same study used about 11.5 watt-hours per image, which is where the viral “one image equals charging your phone” line came from. At the average, it’s closer to 13% of a phone charge.2
- The water number checks out too. Electricity takes water to generate, and Lawrence Berkeley National Laboratory pegs it at about 4.52 liters per kilowatt-hour for data center power.7 Apply that to the documentary’s 228,000 kWh and you get the 273,000 gallons the original post claimed.
So the honest version is not “one video equals 78 million images.” It’s this: an hour of YouTube, a Netflix binge, a doom-scroll, and a handful of AI images all live in the same neighborhood, and nobody is filming tearful documentaries about the Netflix binge.
What a Prompt Actually Costs
Let’s talk about water, because “AI is drinking our water” is the line that really sticks.
Five drops per prompt. Hold that thought.
- A hamburger takes about 2,400 liters of water to produce, mostly to grow the cattle feed.8 That’s the water footprint of roughly 9 million Gemini prompts. To be fair, most of a burger’s water is rain falling on pasture rather than water pumped out of a river, so it’s not a perfect swap. It’s still a burger.
- One pair of jeans takes around 7,500 liters, according to the United Nations.9 That’s about 29 million prompts. Per pair.
- American golf courses applied an estimated 1.63 million acre-feet of water in 2024, according to their own trade association’s survey.10 That’s about 531 billion gallons. U.S. data centers used about 17 billion gallons directly for cooling in 2023.7 Golf used roughly 30 times as much. Even if you add the water used to generate all of the data centers’ electricity, golf still comes out ahead by about two to one.
I’ve never seen a viral video titled The Dark Side of the Back Nine.
None of this means water use doesn’t matter. It means the scale people imagine, where every cute AI picture empties a reservoir, is wildly off. And if your concern is genuinely water, there are much bigger fish. Most of them are being irrigated.
Where the Critics Are Right
Here’s the part the pro-AI crowd likes to skip, and skipping it is exactly how you lose the argument.
Data centers as an industry are growing fast, and the problems are real. They’re just not where most people think they are.
The totals are climbing. U.S. data centers used about 4.4% of the country’s electricity in 2023. Lawrence Berkeley National Laboratory projects 6.7% to 12% by 2028.7 Globally, the IEA estimates data centers used about 415 terawatt-hours in 2024, around 1.5% of the world’s electricity, and expects that to more than double by 2030.11
The tech giants’ emissions went up, not down, three reports in a row.
- Google’s 2024 report said its emissions rose 13% in a single year and were up 48% from 2019, driven by data center energy use and its supply chain.1213 The 2025 report showed another 11% increase, with data center electricity use up 27%. That same year, Google changed which supply chain emissions count toward its climate target, and warned the change affects comparisons with earlier years.14 The 2026 report said electricity use jumped 37%, the biggest increase in the company’s history, and that the AI buildout is “accelerating faster than the grid is decarbonizing.”15 Coverage of that report put Google’s total footprint up 18% for the year and roughly 81% above 2019.16
- Microsoft’s 2024 report put its emissions 29.1% above its 2020 baseline, mostly from building data centers and the hardware inside them.17 The 2025 report said 23.4% above 2020, while the company’s energy use was up 168% over the same period.18 If you’re wondering how the number went from 29.1% to 23.4% while Microsoft kept building, don’t read it as progress. Microsoft’s 2025 data fact sheet says some categories of emissions are now calculated with life-cycle assessments, a different method from before, and a change in method makes year-to-year comparisons shaky.19 When a company changes the ruler, check the ruler before you celebrate the measurement. The next year’s report answered the question anyway. The 2026 report showed emissions up 25% in a single year, to about 20.3 million metric tons. Part of that jump came from Microsoft dropping cheap renewable energy certificates that had been making its numbers look better. The company’s own verdict: “sustainability solutions are not scaling fast enough.”2021
- And the official numbers may be the flattering version. A 2024 Guardian analysis found that emissions from the company-owned data centers of Google, Microsoft, Meta and Apple from 2020 to 2022 were likely about 7.6 times higher than reported, once you count the actual power grid they ran on instead of the renewable credits they bought.22
Neighbors are paying for it. In the PJM grid that serves much of the eastern U.S., the price of reserving power capacity jumped from about $29 to about $270 per megawatt-day in a single auction. PJM’s independent market monitor attributed $16.6 billion of $30.8 billion in costs across two auctions to data center demand.2324 Researchers at Harvard’s Electricity Law Initiative reviewed nearly 50 utility proceedings and argued that special deals for big tech customers are shifting grid costs onto everyone else’s bills.25
Some of them are being built in exactly the wrong places. A Bloomberg analysis found about two-thirds of new data centers built or planned since 2022 sit in areas already under high water stress.26 And in Memphis, aerial images in 2025 showed 35 gas turbines at Elon Musk’s xAI data center, more than 30 of them running without permits. The county later permitted 15.2728
Those are legitimate fights. Notice what they have in common, though. Every one of them is about where data centers get built, how they get powered, and who pays the bill. Not one of them is solved by shaming a mom for turning her kid into a fuzzy doll.
If you care about this, the useful targets are utility commissions, zoning boards, permitting agencies and the companies signing the power contracts. That’s where the decisions get made. The comment section under someone’s profile picture is not where the decisions get made.
Regulate Them, Tax Them, Make Them Pay
Here’s where I want to be very clear, because “AI is fine, actually” is not the same thing as “let the trillion-dollar companies do whatever they want.”
Using AI and demanding that the companies building it play by the rules are not opposite positions. They’re the same position. You can drive a car and still want the factory down the road held to emissions limits. Nobody calls that hypocrisy. They call it having a town.
So here’s what holding them accountable actually looks like, and the good news is that some of it is already happening.
Make them pay for their own power lines. When a data center the size of a small city plugs into the grid, somebody pays for the new substations and transmission. For years, that somebody was often everybody. States are starting to fix that:
- Ohio regulators ruled in July 2025 that new data centers over 25 megawatts must pay for at least 85% of the power they say they’ll need, for up to 12 years, even if they end up using less. No more reserving a mountain of capacity and leaving residents holding the bill.29
- Texas passed SB 6 in June 2025. Big new loads have to share the cost of connecting to the grid, pay at least $100,000 just to have their request studied, and can be cut off during grid emergencies. In Texas, of all places, the data centers go dark before your air conditioning does.30
- Georgia regulators voted in January 2025 to make new customers over 100 megawatts pay transmission and distribution costs as they’re built, with every contract reviewed by the state.31
- Oregon passed the POWER Act in 2025, creating a separate rate class for the biggest users. When Portland General Electric put it into practice, the reported result was about a 30% increase for large data centers and a small cut for households.3233
That’s the model. You want the power? You pay for the plant.
Stop paying them to show up. This one makes me laugh, in the way that isn’t funny. States collectively give up more than $3 billion a year in tax breaks for data centers, according to the watchdog group Good Jobs First, and ten states each lose more than $100 million.34 Virginia’s own legislative auditors found its sales tax exemption saved data center companies $928 million in a single year.35 Local reporting on that analysis put the return at about 48 cents in other tax revenue for every dollar given away.36
We are giving tax breaks to some of the richest companies in human history so they’ll build in places they were going to build anyway, because that’s where the power and fiber already are. Tax breaks should be earned with real commitments: local jobs, clean power, paid-for infrastructure, published water use. Otherwise it’s just a coupon for billionaires.
Make them cool the servers without draining the river. The technology to do this exists, and the companies have already shown they can use it when pushed:
- Microsoft announced in December 2024 that its new data center designs use zero water for cooling, saving an estimated 125 million liters a year per site. The first two are slated for Phoenix and for Mount Pleasant, Wisconsin, in Racine County.37
- Meta’s data center in Odense, Denmark, captures server heat and pipes it into the city’s district heating system, warming roughly 11,000 homes.38
- Google has cooled its data center in Douglas County, Georgia, with recycled water instead of drinking water since 2012.39
Closed-loop cooling, recycled water and heat reuse should be the floor, not a press release. If a company can build a zero-water data center in the Arizona desert, it can build one in your county.
Make them show their work. You can’t hold anyone accountable for numbers they won’t publish. The European Union now requires every data center with at least 500 kilowatts of IT equipment to report its energy use, water use, renewable share and waste heat to a public database.40 Utah passed a water reporting law for large data centers in 2026, and California followed with a package of data center laws that September.4142 Every state should do the same. If it’s that clean, they shouldn’t mind showing us.
And make the consequences real. Remember the xAI turbines in Memphis? The company removed the unpermitted ones only after the Southern Environmental Law Center threatened to sue. No regulator ever fined it. The local appeal was eventually dismissed, and the NAACP filed a federal Clean Air Act lawsuit in 2026.27 When enforcement depends on nonprofits having lawyers to spare, it isn’t enforcement. Permits need teeth: fines that actually hurt, shutdowns when companies run equipment they never got approved, and real penalties for broken promises on water and power.
Put Them Where They Don’t Hurt Anyone
The single biggest decision about a data center’s impact is made before anyone pours concrete: where it goes.
A data center doesn’t need a view. It doesn’t need to be next to a school, a subdivision or a historic battlefield. It needs land, power, fiber and a way to stay cool. That means the smart places are cool climates, sites next to renewable power and existing transmission, and land far enough from homes that nobody’s kids fall asleep to the hum of cooling fans and backup generators.
Communities are learning they can say no, and say it loudly:
- Tucson’s city council voted 7 to 0 in August 2025 to end Project Blue, a 290-acre data center tied to Amazon, after residents fought it over water use in the desert. The developer later came back with a plan using closed-loop air cooling instead.4344 Pressure works.
- Prince William County, Virginia, approved the Digital Gateway, a plan for 37 data centers on more than 2,100 acres near homes and a national battlefield park. A judge voided the rezoning in August 2025 because the county hadn’t properly notified the public, and an appeals court upheld that ruling in 2026.4546
- Ireland, where data centers use about a fifth of the country’s electricity, ruled in December 2025 that new ones must bring their own power generation or storage, supply power back to the grid, and eventually match most of their demand with new Irish renewables.47
- Singapore paused new data centers entirely from 2019 until 2022, then reopened only to projects that met strict efficiency standards.48
That’s what good siting looks like. Not “never build anything,” but “build it where the land, the water and the grid can actually take it, and where the people living nearby got a real say.”
If you want to fight data centers, fight there. Show up to the zoning meeting. Call your utility commission. Ask your state legislators why the tax break exists and what the public got for it. That’s a fight that changes things. Dunking on someone’s AI-generated holiday card does not.
The Consistency Test
Here’s a simple rule worth keeping in your pocket: the electricity doesn’t care what you’re using it for.
A kilowatt-hour spent rendering a funny AI image and a kilowatt-hour spent streaming a video about how evil AI images are come out of the same grid, burn the same fuel and drink the same water. If your concern about data centers is genuinely environmental, it has to extend to social media, video streaming, cloud photo storage, online gaming and the 47 tabs you have open right now.
Most people’s concern doesn’t extend that far, and that tells you something. It tells you the objection isn’t really about resources. It’s about which uses feel legitimate. And that’s a values argument dressed up in a lab coat.
There’s a whole body of research on why people do this. Psychologists call it motivated reasoning: we scrutinize evidence that threatens our side and wave through evidence that supports it. It’s not a stupid-people problem. It’s a people problem. In one well-known Yale study, people who were better with numbers were more likely to misread data when the right answer clashed with their politics, not less.49
So yes, question the AI companies. Question their energy deals, their emissions reports, their glossy sustainability promises. And question the creator telling you a single image boils a lake, using the very same skepticism. The fact-check has to point both ways or it isn’t a fact-check.
We’ve Panicked Like This Before
None of this is new. Every major technology arrives with a chorus of people explaining why it will rot our brains, ruin our morals or kill an entire profession. Some of the chorus turns out to have had a point. Most of it is just funny in hindsight.
Writing. Around 370 BCE, Plato told a story in which an Egyptian king warns the inventor of writing that it “will create forgetfulness in the learners’ souls,” producing people with “the show of wisdom without the reality.”50 We know Plato thought this because he wrote it down.
The printing press. In the 1470s, a Venetian friar named Filippo de Strata wrote to the city’s ruler demanding the presses be shut down, describing literature as “a maiden with a pen, a harlot in print.”51 In 1492 the abbot Johannes Trithemius wrote In Praise of Scribes, defending hand-copied books against printed ones. It was printed in 1494.52 And in 1545 the Swiss scholar Conrad Gessner complained about the “confusing and harmful abundance of books.” Information overload, 1545 edition.53
Photography. The painter Paul Delaroche supposedly looked at a daguerreotype in 1839 and declared, “From today, painting is dead.” There’s no reliable record he ever said it, and his actual written opinion of the daguerreotype was favorable.54 The poet Charles Baudelaire, though, really did call photography art’s “most mortal enemy” and “the refuge of all failed painters” in 1859.55 Painting is, at last check, still alive.
Bicycles. In the 1890s the press warned of “bicycle face,” a wearied, exhausted expression supposedly caused by the strain of balancing.56 Doctors also debated whether bicycle saddles posed a moral danger to women, and a gynecologist addressed the question in an 1895 medical journal article.57 Women kept riding. The bicycle became one of the great symbols of women’s independence.
Radio. In 1933, a group of mothers in Scarsdale, New York, complained that children’s radio programs “shatter nerves, stimulate emotions of horror, and teach bad grammar.” They rated Little Orphan Annie “Very Poor.”58
Chess. In 1859, Scientific American called chess “a mere amusement of a very inferior character, which robs the mind of valuable time that might be devoted to nobler acquirements.”59
The VCR. My personal favorite. In 1982, the head of the Motion Picture Association of America, Jack Valenti, told Congress that “the VCR is to the American film producer and the American public as the Boston strangler is to the woman home alone.”60 The Supreme Court ruled 5 to 4 in 1984 that recording TV at home was legal.61 By 1986, video rentals and sales together brought in more money than the box office.62 The strangler, it turned out, was Hollywood’s biggest customer.
Now, the fair version. Not every worry was dumb. The Luddites, whose name became the insult for anyone who fears technology, weren’t anti-machine at all. They were skilled textile workers fighting low pay and bad conditions as factory owners used new machines to cut their wages.63 That’s a labor argument, and it was a real one. The same is true today. Questions about who profits from AI, who gets displaced and who pays the power bill are legitimate.
“Every AI image is destroying the planet” is not one of those questions. It’s bicycle face.
Why Learning These Tools Is the Whole Point
Here’s where this stops being an internet argument and starts being about how you pay your mortgage.
The overwhelming majority of American businesses are tiny. According to the Small Business Administration, there are about 29.8 million nonemployer businesses in the U.S., meaning one person and no payroll. That’s 82% of all small businesses.64 Women own 12.7 million of them.
Those people are the business. They’re the CEO, the marketing department, the bookkeeper, the customer service desk, the IT department and the person who forgot to eat lunch. And it shows. In one study of entrepreneurs, 72% reported being affected directly or indirectly by mental health conditions.65 In a 2024 survey of founders, 54% said they’d experienced burnout in the past year.66
The traditional answer to “I’m drowning” is “hire someone.” That’s a real answer, and it’s an expensive one. The average private-sector employee costs an employer about $46.89 an hour once you include benefits, which make up about 30% of the total.67 The average cost just to fill a non-executive position was about $5,475 in 2025, before that person does a single thing.68
This is where AI changes the math, and the research is much more interesting than the hype.
It works, and it works best for people who aren’t already experts. In a study published in Science, professionals using ChatGPT finished writing tasks 40% faster with 18% higher quality.69 In a study of more than 5,000 customer support agents, AI assistance raised productivity about 15% on average and about 30% for the least experienced workers.70 That’s the point. It gives you the experience you haven’t had time to build.
But it only works if you know what it’s good at. Harvard Business School and Boston Consulting Group gave 758 consultants access to GPT-4. On tasks the AI was good at, they completed 12.2% more work, 25.1% faster, at more than 40% higher quality. On a task deliberately chosen to fall outside what the AI could do well, the consultants using it were 19 percentage points less likely to get the right answer than those working without it.71 The researchers called this the “jagged frontier.” The tool is brilliant at some things and confidently wrong at others, and the boundary isn’t obvious until you’ve used it a lot.
And you can’t just feel your way there. In a 2025 experiment, experienced software developers using AI tools were actually 19% slower, while believing they’d been 20% faster.72 The researchers have since said newer tools are probably speeding people up, but the gap between how fast people felt and how fast they were is the lesson.73
Even when the tool is smarter, the human using it has to know how. In a 2024 study in JAMA Network Open, GPT-4 working alone scored 92% on diagnostic reasoning cases. Doctors given GPT-4 as a helper scored 76%, barely better than the 74% for doctors without it.74 The tool was there. The skill in using it wasn’t. And for the record, GPT-4’s famous “90th percentile on the bar exam” claim didn’t hold up well either. A later analysis put it closer to the 62nd percentile among first-time test takers.75 Brilliant generalist, not an oracle. Which is exactly why you need to know when to double-check it.
That’s the “expert in your pocket” argument, stated carefully. You get a tireless research assistant, copywriter, analyst, coder, editor and sounding board for the price of a monthly subscription. What you don’t get is judgment. The judgment is yours, and it only gets good with practice.
The people who build that practice are pulling ahead. Solo founders made up about 36% of new startups on Carta’s platform in the first half of 2025, up from about 24% in 2019.76 A bootstrapped six-month-old company called Base44, run by one founder with a handful of employees, sold to Wix for $80 million in cash in 2025.77 Sam Altman has said his tech CEO friends have a betting pool on the first one-person billion-dollar company.78
Meanwhile, the U.S. Census Bureau’s business survey found that fewer than 20% of the smallest businesses, those with four or fewer employees, reported using AI in 2026, compared with 37% of companies with 250 or more employees.79 The big companies are already doing this. The question is whether the little ones learn it in time.
So when someone tells a small business owner that using AI is unethical because of data centers, here’s what they’re actually asking: that the person with the fewest resources voluntarily give up the one tool that lets them compete with the companies that have entire departments. The corporations are not going to stop. They are building the data centers.
Opting out doesn’t save the planet. It just takes you off the board.
Slop Is a Skill Issue
In 2025, Merriam-Webster named “slop” its Word of the Year, defined as “digital content of low quality that is produced usually in quantity by means of artificial intelligence.”80 Fair enough. There’s a lot of it. Fake books, fake recipes, six-fingered stock photos, and LinkedIn posts that start with “In today’s fast-paced world.”
But here’s the thing about slop. The AI didn’t upload it. A person did.
When fake books started flooding Amazon, the author Jane Friedman found five titles she never wrote being sold under her name. Amazon initially refused to take them down and asked her for “any trademark registration numbers that relate to your claim.”81 By that September, Amazon had capped self-publishers at three new books a day and started requiring them to disclose AI-generated content.82 Somebody had to write that policy because somebody was dumping garbage at an industrial scale. That’s a human choosing quantity over quality. The tool just made it cheaper to be lazy.
And the most famous AI disasters? Every one of them has a human at the bottom of it who didn’t check.
- The lawyers. In 2023, two New York attorneys filed a brief citing six court cases that didn’t exist. ChatGPT made them up. One of the lawyers later said he believed ChatGPT “could not possibly be fabricating cases on its own.” The judge fined them $5,000 and made them send copies of the ruling to every real judge whose name had been attached to a fake opinion.83 You’d think that would be the end of it. A legal researcher tracking AI hallucinations in court filings has now logged more than 2,300 cases.84
- The summer reading list. In May 2025, the Chicago Sun-Times and the Philadelphia Inquirer ran a syndicated summer reading list in which 10 of the 15 books didn’t exist, including a novel “by” Isabel Allende called Tidewater Dreams. The freelance writer behind it said he usually checks his sources. “This time, I did not and I can’t believe I missed it because it’s so obvious. No excuses.”85
- The consultants. Deloitte delivered a report to the Australian government under a contract worth A$440,000. It turned out to contain fabricated references and a made-up quote from a federal court ruling. Deloitte agreed to refund part of the fee.86
- The government. The White House’s 2025 MAHA report on children’s health cited studies that didn’t exist, and some of its reference links contained “oaicite,” a marker left behind by OpenAI’s tools. The administration called them “formatting issues.”87
Not one of those is a story about a machine going rogue. Every one is a story about a person who outsourced their job, skipped the part where you read what you’re signing, and hit send.
Yes, the AI makes things up. That’s exactly why the skill matters. OpenAI’s own researchers published a paper in 2025 explaining why. Standard training and testing “reward guessing over acknowledging uncertainty.” Think of a multiple-choice test with no penalty for wrong answers. A model that guesses scores better than one that says “I don’t know,” so that’s what it learns to do.88 Even when you hand the best models a document and ask them only to summarize it, they still add something that isn’t in it a few percent of the time.89
So if your AI is making things up, ignoring your instructions, or handing you something generic and beige, the first question isn’t “is AI garbage?” It’s “what did I give it to work with?” Most of the time, the problem is a two-line prompt asking a tool with no context to read your mind.
Here’s what the people who get good results actually do, and most of it isn’t what the “10 prompts that will change your life” carousels tell you:
- Give it the source instead of asking it to remember. This is the big one. In a 2025 study of a cancer information chatbot, GPT-4 made things up in 37% of answers when it worked from memory, 13% when it pulled from Google search results, and 0% when it was given a trusted cancer information source to work from.90 Same model. The difference was what the human handed it.
- Give it permission to say “I don’t know.” Anthropic’s own guidance says explicitly allowing the model to admit uncertainty “can drastically reduce false information.”91 Left to its own devices, it’s that student guessing on the test. Tell it a blank is better than a bluff.
- Make it quote before it concludes. For long documents, have it pull the exact passages first and then answer only from those. If it can’t find a quote, the claim goes.91
- Show it what good looks like. Paste in two or three examples of the output you want. The 2020 paper that introduced GPT-3 showed these models can pick up a new task from just a few examples in the prompt.92 OpenAI’s own guide says to give the model a range of example inputs paired with the outputs you want.93
- Make it show its work. Asking for step-by-step reasoning measurably improves accuracy on problems that take more than one step.94
- Give it the context you’d give a new employee. Who it’s for, what it’s for, what you’ve already tried, what “done” looks like, what to avoid. “Write a blog post about water heaters” gets you slop. Your audience, your voice, three past posts you liked and the five facts it must include gets you a draft.
- Check the last mile yourself. Every name, number, quote and citation that matters. Not because the tool is useless, but because your name is on it.
Remember the Harvard and BCG consultants from earlier? The ones whose results got worse when they used AI on the wrong kind of task? That’s not proof the tool is bad. It’s proof that knowing where it fails is part of the job.
AI doesn’t make you lazy. It makes laziness visible faster. A good writer with AI produces better work faster. A lazy one produces garbage at scale. The difference has never been the tool.
So Who’s Really Thinking for Themselves?
The irony of the outrage video isn’t that it uses electricity. Everything uses electricity. The irony is that it asks millions of people to feel a certain way about a technology without asking them to look at a single number, and then those millions share it, stream it, and react to it on servers in the very data centers it’s warning them about.
Thinking for yourself doesn’t mean believing the opposite of whatever the outrage video said. It means doing the math. Sometimes the math says the critics are right: about power bills, about turbines in Memphis, about building water-hungry facilities in the desert. And sometimes the math says the fuzzy doll is fine.
Plato worried writing would give people “the show of wisdom without the reality.” He had a point, just not about writing. The show of wisdom is sharing a video you didn’t check. The reality is learning the tool, understanding the tradeoffs, and using both to build something.
Sources
- Carbon Brief, Factcheck: What Is the Carbon Footprint of Streaming Video on Netflix? (George Kamiya, IEA; updated November 2020)
- Luccioni, Jernite and Strubell, Power Hungry Processing: Watts Driving the Cost of AI Deployment? (ACM FAccT 2024)
- The Carbon Trust, Carbon Impact of Video Streaming (June 2021)
- Elsworth et al., Measuring the Environmental Impact of Delivering AI at Google Scale (Google, August 2025)
- Epoch AI, How Much Energy Does ChatGPT Use? (February 2025)
- Sam Altman, The Gentle Singularity (June 2025)
- Lawrence Berkeley National Laboratory, 2024 United States Data Center Energy Usage Report (December 2024)
- Water Footprint Network, Product Water Footprints (hamburger, 2,400 liters)
- UN News, UN Launches Drive to Highlight Environmental Cost of Staying Fashionable (March 2019)
- Golf Course Superintendents Association of America, Golf Courses Reduce Water Usage by 31 Percent, According to National Survey (December 2025)
- International Energy Agency, Energy and AI: Executive Summary (April 2025)
- Google, Our 2024 Environmental Report (July 2024)
- Engadget, Google's Greenhouse Gas Emissions Climbed Nearly 50 Percent in Five Years Due to AI (July 2024)
- Google, Our 2025 Environmental Report (June 2025)
- Google, Our 2026 Environmental Report (June 2026)
- ESG Dive, Google's Emissions Continue to Climb Due to AI Buildout (2026)
- Microsoft, 2024 Environmental Sustainability Report (May 2024)
- Microsoft, 2025 Environmental Sustainability Report (May 2025)
- Microsoft, 2025 Environmental Data Fact Sheet
- Microsoft, Responsibly Building the AI Future: 2026 Environmental Sustainability Report (July 2026)
- ESG Dive, Microsoft's Data Center Expansion Drove 25% Emissions Spike (2026)
- The Guardian, Data Center Emissions Probably 662% Higher Than Big Tech Claims (September 2024)
- PJM Inside Lines, PJM Capacity Auction Procures Sufficient Resources to Meet RTO Reliability Requirement (July 2024)
- Utility Dive, Data Centers Drove PJM Capacity Prices, Market Monitor Says (October 2025)
- Martin and Peskoe, Extracting Profits from the Public: How Utility Ratepayers Are Paying for Big Tech's Power (Harvard Electricity Law Initiative, March 2025)
- Bloomberg, AI Is Draining Water From Areas That Need It Most (2025)
- Southern Environmental Law Center, Inside Memphis' Fight Against xAI
- TechCrunch, xAI Gets Permits for 15 Natural Gas Generators at Memphis Data Center (July 2025)
- Utility Dive, Ohio Regulators Approve AEP Data Center Interconnection Rules (July 2025)
- Utility Dive, Texas Law Gives Grid Operator Power to Disconnect Data Centers During Crisis (June 2025)
- The Current GA, Georgia PSC Passes Rule for Data Centers' Power Usage (January 2025)
- OPB, Oregon Lawmakers Pass Bill on Data Center and Cryptocurrency Power Costs (June 2025)
- Tom's Hardware, Oregon Utility Raises Data Center Rates About 30 Percent and Cuts Residential Rates Under the POWER Act (2026)
- Bloomberg Government, State Losses From Data Center Tax Breaks Top $3 Billion Annually (on Good Jobs First, Cloudy Data, Costly Deals, April 2025)
- Joint Legislative Audit and Review Commission, Data Centers in Virginia, Report 598 (December 2024)
- Cardinal News, on JLARC's Analysis of Virginia's Data Center Tax Exemption
- Microsoft, Sustainable by Design: Next-Generation Datacenters Consume Zero Water for Cooling (December 2024)
- Ramboll, Meta Surplus Heat to District Heating (Odense, Denmark)
- Google Data Centers, Douglas County, Georgia
- European Commission, Energy Performance of Data Centres (Delegated Regulation 2024/1364)
- Utah Division of Water Rights, Data Centers (HB 76, 2026)
- Office of the Governor of California, Governor Newsom Signs Most Comprehensive Data Center Laws in the Nation (September 2026)
- AZ Luminaria, Tucson City Council Rejects Project Blue Amid Intense Community Pressure (August 2025)
- Axios Phoenix, Project Blue Data Center Clears Vote (December 2025)
- WTOP, Judge Voids Digital Gateway Rezoning in Prince William County (August 2025)
- Virginia Lawyers Weekly, Virginia Court Upholds Block on Prince William Digital Gateway (April 2026)
- The Irish Times, New Data Centres Must Generate and Supply Electricity to Wider Market, Regulator Rules (December 2025)
- Computer Weekly, Singapore to Restart Datacentre Builds With Sustainability Focus
- Kahan, Peters, Dawson and Slovic, Motivated Numeracy and Enlightened Self-Government, Behavioural Public Policy (2017)
- Plato, Phaedrus, translated by Benjamin Jowett (MIT Internet Classics Archive)
- History of Information, Filippo de Strata's Polemic Against Printing (1473 to 1474)
- History of Information, Trithemius, De laude scriptorum (written 1492, printed 1494)
- Ann Blair, Reading Strategies for Coping with Information Overload, ca. 1550 to 1700, Journal of the History of Ideas (2003)
- Smithsonian Institution Archives, Photography Murdered Painting, Right?
- Quote Investigator, Photography Has Become Art's Most Mortal Enemy (Baudelaire, Salon of 1859)
- The Oldie, Olden Life: What Was Bicycle Face?
- Robert L. Dickinson, Bicycling for Women from the Standpoint of the Gynecologist, American Journal of Obstetrics (1895)
- TIME, Education: Mothers v. Curdlers (March 13, 1933)
- Smithsonian Magazine, 19th-Century Concern Trolling: Chess Is a Mere Amusement of a Very Inferior Character
- Home Recording of Copyrighted Works, Hearings Before the House Judiciary Subcommittee on Courts, Civil Liberties, and the Administration of Justice, 97th Congress (April 12, 1982)
- Sony Corp. of America v. Universal City Studios, Inc., 464 U.S. 417 (1984)
- Entertainment Merchants Association, Industry History: 1980 to 1989
- Richard Conniff, What the Luddites Really Fought Against, Smithsonian Magazine (March 2011)
- SBA Office of Advocacy, Frequently Asked Questions About Small Business (2026)
- Freeman et al., The Prevalence and Co-Occurrence of Psychiatric Conditions Among Entrepreneurs and Their Families, Small Business Economics (2019)
- Sifted, Founder Mental Health Survey (2024)
- U.S. Bureau of Labor Statistics, Employer Costs for Employee Compensation, June 2026
- SHRM, 2025 Recruiting Benchmarking Report (October 2025)
- Noy and Zhang, Experimental Evidence on the Productivity Effects of Generative Artificial Intelligence, Science (July 2023)
- Brynjolfsson, Li and Raymond, Generative AI at Work, Quarterly Journal of Economics (2025)
- Dell'Acqua et al., Navigating the Jagged Technological Frontier, Harvard Business School Working Paper 24-013 (September 2023)
- METR, Measuring the Impact of Early-2025 AI on Experienced Open-Source Developer Productivity (July 2025)
- METR, Uplift Update (February 2026)
- Goh et al., Large Language Model Influence on Diagnostic Reasoning, JAMA Network Open (October 2024)
- Eric Martínez, Re-evaluating GPT-4's Bar Exam Performance, Artificial Intelligence and Law (2024)
- Carta, Solo Founders Report (2025)
- TechCrunch, 6-Month-Old, Solo-Owned Vibe Coder Base44 Sells to Wix for $80M Cash (June 2025)
- Fortune, Sam Altman and the One-Person Unicorn (February 2024)
- U.S. Census Bureau, AI Use Among Businesses (May 2026)
- TechCrunch, Merriam-Webster Names Slop the Word of the Year (December 2025)
- Jane Friedman, I Would Rather See My Books Get Pirated Than This (August 2023)
- Authors Guild, Amazon Adds to KDP Generative AI Policy, Caps Daily Self-Publishing Uploads (September 2023)
- ABA Journal, Lawyers Who Doubled Down and Defended ChatGPT's Fake Cases Must Pay $5K, Judge Says (June 2023)
- Damien Charlotin, AI Hallucination Cases Database
- Nieman Lab, You Won't Find These on the Shelf: Newspapers Print an AI-Generated Reading List With Fake Books (May 2025)
- The Register, Deloitte Refunds Australian Government Over AI Errors in Report (October 2025)
- NBC News, Trump Administration Corrects MAHA Report After Citation Errors (May 2025)
- OpenAI, Why Language Models Hallucinate (September 2025)
- Vectara, Hallucination Leaderboard (updated November 2026)
- Nishisako, Higashi and Wakao, Retrieval-Augmented Generation and Hallucination in a Cancer Information Chatbot, JMIR Cancer (September 2025)
- Anthropic, Reduce Hallucinations (Claude Documentation)
- Brown et al., Language Models Are Few-Shot Learners (2020)
- OpenAI, Prompt Engineering Guide
- Wei et al., Chain-of-Thought Prompting Elicits Reasoning in Large Language Models (2022)